Preconstruction without the commercial blind spots.
Discover verified capability, issue controlled tender packages, reuse qualification evidence, build estimates, and compare bids line by line.
Lowest return does not mean lowest commercial risk.
Illustrative workspace: quote comparison, RFQ lines, relationship questionnaires, and award history. Not a public board.
| Scope item | Northline | Cobalt | Meridian | Target |
|---|---|---|---|---|
| Metal stud partitions | £142,000 | £138,000 | £145,000 | £140,000 |
| Acoustic insulation | £48,000 | £44,000 | £49,000 | £46,500 |
| Suspended ceilings | £89,000 | £86,000 | £91,000 | £88,000 |
| Fire stopping | £22,000 | £22,000 | £24,000 | £22,000 |
| Waste and skips | £12,000 | £11,500 | £12,000 | £12,000 |
| Normalized total | £313,000 | £301,500 | £321,000 | £308,500 |
| NRM2 Code | Description | Unit | Quantity | Rate | Total (£) | Status |
|---|---|---|---|---|---|---|
| K10/125 | Acoustic gypsum stud partition 100mm, 45dB sound reduction | m² | 1,880 | £75.50 | £141,940 | PACKAGE LINKED |
| K10/140 | High-density acoustic mineral wool quilt insulation 50mm | m² | 1,880 | £24.75 | £46,530 | PACKAGE LINKED |
| K40/110 | Suspended ceiling tile system 600x600mm mineral fibre grid | m² | 1,120 | £78.50 | £87,920 | PACKAGE LINKED |
| P10/220 | Intumescent fire stopping to service penetrations (2hr EI rated) | nr | 340 | £64.70 | £21,998 | RFQ LINE |
| S10/100 | Segregated dry waste disposal, enclosed 14yd roll-on skips | wk | 24 | £500.00 | £12,000 | SCHEDULED |
| Base BoQ Measured Subtotal | £310,388 | LOCKED | ||||
Cobalt Interiors UK
ORGANIZATION RECORD // BIRMINGHAMMeridian Ceilings Ltd
ORGANIZATION RECORD // LONDONThe complete pre-award workspace.
Find the right construction capability
Inside the platform, search verified member organizations by active service categories, location and working radius, relationship status, qualification evidence, and performance records.
Develop a private supply chain
Connect with verified organizations, issue relationship PQQs, approve partners, and retain buyer-only scores and notes.
Compile one controlled tender issue
Define package scope, dates, BoQ items, questionnaire requirements, selected participants, drawings, specifications, clarifications, and addenda.
Match work to capability
Inside the platform, discover open packages or receive private invitations, inspect package scope, and record a Go / No-Go review.
Apply qualification when issued
Assess standing relationship evidence and package-specific answers before a bidder proceeds to quotation where the buyer requires it.
Build cost from rates and assemblies
Structure labour, plant, material, subcontractor, markup, and waste in versioned internal estimate scenarios.
Make the award decision auditable
Compare quote items, flag exclusions, request revisions, record recommendations, and convert the approved return into an award and work order.
Every bidder works from the same tender record.
Package documents are linked to the tender. Clarifications can be private or published. Addenda are sequentially numbered, issued to participants, and retained with the package history.