Skip to content
Sarvek
Verified network DYNAMIC ROLE
DRAWING SRV-A1-CMD
SCALE 1:50 @ A1
REV C / LIVE
SRV / VERIFIED CONSTRUCTION NETWORK GRID 51.5N / 0.1W

Build the future of construction collaboration.

One verified platform where construction companies connect, qualify, bid, procure, award, and deliver projects.

PACKAGE TOKENSRV-MEP-042
STATETENDER OPEN
QUALIFIED06 TRADES
RETURN GATE17 SEP 12:00
IDENTITY
ONE COMPANY
CONTEXT
BUY OR BID
RECORD
AUDIT HISTORY
REF: SRV-CDE-01 / INFORMATION CONTROL

Fragmented tender information becomes operating order.

Spreadsheets, duplicated questionnaires, email attachments, and untracked revisions create commercial uncertainty. Sarvek moves each decision into one controlled project record.

One identity

The same verified company can procure one package and bid on another.

Private by default

Company records, package activity, and qualification evidence stay inside controlled access.

PQQ_rev3.xlsx
UNCONTROLLED
A-214_RevB.pdf
SUPERSEDED
inbox / RFQ thread
NO ISSUE RECORD
insurance schedule
EXPIRED 12 JUN
BoQ_v7_FINAL2.csv
EXCLUSIONS HIDDEN
site photos.zip
UNLINKED
CONVERGED PACKAGE RECORD COMPANY
VERIFIED
Drawing registerREV CCURRENT
Relationship PQQ18 ITEMSREUSED
Quote leveling3 RETURNS2 GAPS
REGISTRATION CONTROL SEQUENCE

From verified entity to live tendering.

01 / REGISTRATION

Establish the company identity

Request access with organization identity and the first user. Trades and evidence come later, after verification.

02 / VERIFICATION

Pass the platform gate

Sarvek reviews the organization record before operational access is released.

03 / ACTIVATION

Configure the foundation

Branches, team permissions, company documents, and audit history become available.

04 / EXECUTION

Acquire modules and transact

Publish packages, qualify bidders, estimate work, compare returns, and award.

ONE LOGIN / DYNAMIC PROJECT ROLES

Buyer and supplier are contexts, not account types.

The same verified company can procure one package and bid another without duplicating credentials, people, or documents.

Illustrative role-console data below is a demonstration of the two contexts, not live project data.

PACKAGE SRV-MEP-042

Mechanical and electrical services

Tender open
Package value£4.20m
Qualified bidders06
Return deadline17 SEP / 12:00
Northline MEPPQQ PASS£1.08m
Cobalt ServicesRFQ TRANSMITTED—
Meridian PlantBID RETURNEDEXCLUSION
PRECONSTRUCTION WORKSPACE / SEVEN ENGINES

One commercial record from discovery to recommendation.

Illustrative workspace states and values below are examples, not live customer records.

ENGINE 01

Find verified capability

Search other verified companies by trade, city, country, name, and optional distance — inside the logged-in app, not on a public board.

Verified organizationControlled accessAuditable action
TRADECITY / COUNTRYDISTANCE
Issue controlTimestampedLOCKED
Responsible userQS / EstimatorAUDIT ON
PACKAGE CONTROL GATES

The seven-stage procurement lifecycle.

  1. 01

    Draft

    Scope, BoQ, documents, and qualification gate are prepared.

    Gate: package completeness before publish.
  2. 02

    Open package

    Issue date and tender deadline become controlled package data.

    Export: issue notice and drawing register.
  3. 03

    Qualification (optional)

    Relationship evidence and package-specific answers are assessed when issued.

    Gate: qualification outcome before RFQ where required.
  4. 04

    RFQ transmission

    Qualified participants receive the commercial request.

    Record: participant list and issue time.
  5. 05

    Quote comparison

    Returns are normalized and scope gaps are exposed.

    Export: leveling sheet and exclusions.
  6. 06

    Award

    The approved return becomes the commercial commitment.

    Gate: eligible quote on an open package.
  7. 07

    Work order

    Award creates a contract and work order. My Work needs Project Management.

    Handover: Preconstruction to Project Management.
QUALIFICATION INTELLIGENCE

Standing evidence once. Project-specific answers where they matter.

RELATIONSHIP PQQ PARTNER
APPROVED

Reusable company record

Corporate details, insurance, safety policy, accreditations, and financial evidence support the continuing relationship.

PACKAGE PSQ SUBMISSION
LOCKED

Questions tied to the work

Site logistics, named people, method statements, capacity, and project-specific controls are assessed for the package.

ESTIMATE SCENARIO / LIVE MODEL

See commercial decisions change the return.

Illustrative estimate model. Final commercial values remain under estimator control.

LABOUR + PLANT + MATERIAL£1,102,000
SUBCONTRACT ALLOWANCE£143,000
DIRECT COST£1,245,000
MARKUP£74,700
WASTE ALLOWANCE£31,125
ESTIMATE TOTAL£1,350,825
MODULAR OPERATING ARCHITECTURE

A verified foundation with operational layers.

Start with identity, permissions, documents, and auditability. Activate the modules that carry the work forward.

Inspect the platform foundation
LAYER 04 / ROADMAP Scheduling · Field ops · Financials · Closeout · HR
LAYER 03 / PROJECT MANAGEMENT My Work · Deliveries
LAYER 02 / PRECONSTRUCTION Source · Qualify · Package · Estimate · Level · Award
LAYER 01 / VERIFIED FOUNDATION Identity · Branches · RBAC · Documents · Audit
REF: SRV-ADV-10 / STRUCTURAL ADVANTAGES

Commercial control without identity fragmentation.

VERIFIED INTEGRITY

Verified integrity

Organizations enter an authenticated operating network.

UNIFIED WORKFLOWS

Unified workflows

One company identity procures and bids according to project context.

REUSABLE COMPLIANCE

Reusable compliance

Standing qualification evidence is maintained once and reused deliberately.

BID TRANSPARENCY

Bid transparency

Line-item comparison exposes omissions before commitment.

SUPPLY-CHAIN CAPITAL

Supply-chain capital

Relationship and performance history stays with the organization.

MODULAR SCALE

Modular scale

Preconstruction and delivery share the same foundation and records.